Filter :
Standard and/or project under the direct responsibility of ISO/TC 138/SC 8 Secretariat | Stage | ICS |
---|---|---|
Plastics piping systems used for the rehabilitation of pipelines — Classification and overview of strategic, tactical and operational activities
|
30.99 | |
Classification and information on design of plastics piping systems used for renovation
|
95.99 | |
Classification and information on design and applications of plastics piping systems used for renovation and replacement
|
95.99 | |
Plastics piping systems used for the rehabilitation of pipelines — Classification and overview of strategic, tactical and operational activities
|
90.92 | |
Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks — Part 1: General
|
95.99 | |
Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks — Part 1: General
|
90.92 | |
Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks — Part 2: Lining with continuous pipes
|
90.92 | |
Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks — Part 3: Lining with close-fit pipes
|
95.99 | |
Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks — Part 3: Lining with close-fit pipes — Technical Corrigendum 1
|
95.99 | |
Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks — Part 3: Lining with close-fit pipes
|
90.92 | |
Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks — Part 4: Lining with cured-in-place pipes
|
95.99 | |
Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks — Part 4: Lining with cured-in-place pipes
|
90.92 | |
Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks — Part 4: Lining with cured-in-place pipes — Amendment 1: Updated definitions, marking requirements and procedure for alternative expression of flexural test results
|
60.60 | |
Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks — Part 7: Lining with spirally-wound pipes
|
95.99 | |
Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks — Part 7: Lining with spirally-wound pipes
|
90.92 | |
Plastics piping systems for renovation of underground non-pressure drainage and sewerage networks — Part 9: Lining with a rigidly anchored plastics inner layer
|
90.92 | |
Plastics piping systems for renovation of underground drainage and sewerage networks under pressure — Part 1: General
|
95.99 | |
Plastics piping systems for renovation of underground drainage and sewerage networks under pressure — Part 1: General
|
90.92 | |
Plastics piping systems for renovation of underground drainage and sewerage networks under pressure — Part 2: Lining with continuous pipes
|
90.92 | |
Plastics piping systems for renovation of underground drainage and sewerage networks under pressure — Part 3: Lining with close-fit pipes
|
95.99 | |
Plastics piping systems for renovation of underground drainage and sewerage networks under pressure — Part 3: Lining with close-fit pipes
|
90.92 | |
Plastics piping systems for renovation of underground drainage and sewerage networks under pressure — Part 4: Lining with cured-in-place pipes
|
90.92 | |
Plastics piping systems for renovation of underground water supply networks — Part 1: General
|
95.99 | |
Plastics piping systems for renovation of underground water supply networks — Part 1: General
|
90.92 | |
Plastics piping systems for renovation of underground water supply networks — Part 2: Lining with continuous pipes
|
90.92 | |
Plastics piping systems for renovation of underground water supply networks — Part 3: Lining with close-fit pipes
|
95.99 | |
Plastics piping systems for renovation of underground water supply networks — Part 3: Lining with close-fit pipes
|
90.92 | |
Plastics piping systems for renovation of underground water supply networks — Part 4: Lining with cured-in-place pipes
|
90.92 | |
Plastics piping systems for renovation of underground water supply networks — Part 11: Lining with inserted hoses
|
30.60 | |
Plastics piping systems for renovation of underground gas supply networks — Part 1: General
|
95.99 | |
Plastics piping systems for renovation of underground gas supply networks — Part 1: General
|
90.92 | |
Plastics piping systems for renovation of underground gas supply networks — Part 2: Lining with continuous pipes
|
90.92 | |
Plastics piping systems for renovation of underground gas supply networks — Part 3: Lining with close-fit pipes
|
95.99 | |
Plastics piping systems for renovation of underground gas supply networks — Part 3: Lining with close-fit pipes
|
90.92 | |
Piping systems for rehabilitation of underground drains, sewers and water supply networks — Part 1: Polyethylene (PE) material
|
40.00 | |
Piping systems for rehabilitation of underground drains, sewers and water supply networks — Part 2: Thermoset composite materials
|
40.00 | |
Piping systems for rehabilitation of underground drains, sewers and water supply networks — Part 3: Unplasticized poly (vinyl chloride) (PVC-U) material
|
40.00 | |
Piping systems for rehabilitation of underground drains, sewers and water supply networks — Part 4: Thermoplastic composite materials
|
20.00 |
|
Piping systems for rehabilitation of underground gas supply networks — Part 1: Polyethylene (PE) material
|
40.00 | |
Piping systems for rehabilitation of underground gas supply networks — Part 5: Unplasticized Polyamide (PA-U) material
|
20.00 |
|
Plastics piping systems for the trenchless replacement of underground pipeline networks — Part 1: Replacement on the line by pipe bursting and pipe extraction
|
90.92 | |
Plastics piping systems for the trenchless replacement of underground pipeline networks — Part 2: Replacement off the line by horizontal directional drilling and impact moling
|
90.92 | |
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 1: Polyethylene (PE) material
|
30.60 |
|
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 1: Polyethylene (PE) material
|
90.92 | |
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 2: Resin-fibre composite (RFC) material
|
90.92 | |
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 2: Thermoset composite materials
|
30.00 |
|
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 3: Unplasticised poly(vinyl chloride) (PVC-U) material
|
30.60 |
|
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 3: Unplasticised poly(vinyl chloride) (PVC-U) material
|
90.92 | |
Assessment of conformity of plastics piping systems for the rehabilitation of existing pipelines — Part 5: Unplasticized Polyamide (PA-U) material
|
10.99 |
|
No matching records found. Please try changing the filter settings.