Résumé
PreviewISO/TR 17177:2015 provides guidance for installations, equipment and operation at the ship to terminal and ship to ship interface for hybrid floating and fixed LNG terminals that might not comply with the description of "Conventional LNG Terminal" included in ISO 28460.
ISO/TR 17177:2015 is intended to be read in conjunction with ISO 28460 to ensure the safe and efficient LNG transfer operation at these marine facilities.
ISO/TR 17177:2015 also addresses high pressure natural gas (HPNG) at the transfer interface at facilities where liquefaction or regasification is undertaken, but does not describe requirements for the process plant generally forming part of the terminal facility.
These guidelines are based around facilities that are currently in operation or under development.
-
État actuel: PubliéeDate de publication: 2015-04
-
Edition: 1
-
Comité technique: ISO/TC 67/SC 9 Installations de production, de transport et de stockage de gaz liquéfiés cryogéniques
-
- ICS :
- 75.200 Équipement de transport du pétrole, des produits pétroliers et du gaz naturel
Acheter cette norme
Format | Langue | |
---|---|---|
std 1 145 | PDF + ePub | |
std 2 145 | Papier |
- CHF145
Cycle de vie
Vous avez une question?
Consulter notre FAQ
Horaires d’ouverture:
De lundi à vendredi - 09:00-12:00, 14:00-17:00 (UTC+1)
Suivez l'actualité de l'ISO
Inscrivez-vous à notre Newsletter (en anglais) pour suivre nos actualités, points de vue et informations sur nos produits.