ISO 21725-2:2021
p
ISO 21725-2:2021
71513
Indisponible en français

This document provides information to perform the design of the prestressed concrete box girder bridge for road that complies with the limitations established in 6.1. The rules of design as set forth in the document are simplifications of more elaborate requirements. Among several erection methods of box girder bridges, the provisions of this document are mainly applicable to full staging method (FSM).

Designs and details for new road bridges address structural integrity by considering the following:

—    the use of continuity and redundancy to provide one or more alternate paths;

—    structural members and bearing seat widths that are resistant to damage or instability; and

—    external protection systems to minimize the effects of reasonably conceived severe loads.


Informations générales 

  •  : Publiée
     : 2021-11
  •  : 1
  •  : ISO/TC 71/SC 5 Règles pour le calcul simplifié des structures en béton
  •  :
    93.040 Construction des ponts
    91.080.40 Structures en béton

Acheter cette norme

fr
Format Langue
std 1 208 PDF + ePub
std 2 208 Papier
  • CHF208

Vous avez une question?

Consulter notre FAQ

Service à la clientèle
+41 22 749 08 88

Horaires d’ouverture:
De lundi à vendredi - 09:00-12:00, 14:00-17:00 (UTC+1)