Projet de travail approuvé
ISO/AWI 25385
Infrastructure ferroviaires — Travaux de voies ballastées — Réception des travaux sur lignes de voie courante et appareils de voie
Numéro de référence
ISO/AWI 25385
Edition 1
Projet de travail approuvé
ISO/AWI 25385
90091
Un groupe de travail a préparé un projet.

Résumé

This document specifies technical requirements and tolerances for the acceptance of works on ballasted track situated on: — plain line; — switches and crossings; and — rail expansion devices as part of the track for 1 435 mm and wider track gauge railways. The works on ballasted track, hereafter referred to as track works, concern construction of new track, track renewal and track maintenance. This document specifies the requirements for substructure works, track geometry, absolute track position, working parameters of on track machines, track components, ballast cross section, structure gauge, stressing works, specific measurements and quality checks for switches and crossings and rail expansion devices, and for the measuring systems used to perform measurements, verifications and checks for the scope of acceptance. Requirements for responsibilities and documentation necessary for the acceptance of track works are specified. This document also requires compliance of all track materials with the customer’s relevant acceptance criteria and specifications provided by the supplier. Platform reconstruction works and level crossing works are not covered by this document. This document does not apply to urban rail systems or ballastless track.

Informations générales

  •  : Projet
    : Nouveau projet enregistré au programme de travail du TC/SC [20.00]
  •  : 1
  • ISO/TC 269/SC 1
  • RSS mises à jour

Vous avez une question?

Consulter notre Aide et assistance